| Codes & Standards – USA (IEEE P1547.5) | ||||||||||
| Institute of Electrical and Electronic Engineers | ||||||||||
|
SCC21 |
||||||||||
|
IEEE P1547.5 |
||||||||||
|
Technical Guidelines for Interconnection of Electric Power Sources Greater than 10 MVA To the Power Transmission Grid |
||||||||||
| Scope |
This document provides guidelines regarding the technical requirements, including design, construction, maintenance / performance requirements, for interconnecting dispatchable electric power sources with a capacity of more than 10 MVA to a bulk power transmission grid. |
|||||||||
| Purpose |
The purpose of this project is to provide technical information and guidance to all parties involved in the interconnection of dispatchable electric power sources to a transmission grid about the various considerations needed to be evaluated for establishing acceptable parameters such as that the interconnection is technically correct. |
|||||||||
|
||||||||||
| Status |
2007 Target: Establish ballot-ready draft and conduct intra-SCC 21 pre-ballot review. |
|||||||||